EXES-1000 Master Price in Pakistan (All Variants) | Skyrs

Product Overview

The EXES-1000 Master series stands as a highly dependable central control exchange platform designed for critical industrial intercom, duplex communications, and paging applications. Engineered for deployment in demanding sectors like heavy infrastructure, mass transport facilities, secure complexes, and large-scale industrial plants, the EXES-1000 system ensures zero-latency, high-intelligibility voice processing under all conditions.

In Pakistan, SKYRS delivers authenticated hardware distribution alongside customized deployment architecture for the complete EXES-1000 product line.

Variant Matrix

The EXES-1000 Master framework is provided across three physical scale configurations to fit varied operational parameters:

Metric / Parameter EXES-1000 Master Compact EXES-1000 Master Standard EXES-1000 Master Max-Capacity
Line Station Capacity Up to 32 stations Up to 64 stations Up to 128 stations (Expandable)
Central Processor Unit CCU-11B Core Dual-Redundant CCU Cores High-Throughput Matrix Array
Audio Frequency Link 300 Hz – 7 kHz Optimized 300 Hz – 7 kHz Enhanced 200 Hz – 10 kHz Broad Range
Paging Output Zones 4 Configurable Zones 8 Configurable Zones 16 Independent Matrix Zones
Power Protection Single AC Adapter Line Dual-Input AC Switching Hot-Swappable DC/AC Redundancy
Backup Storage Ni-Cd Battery Configuration Ni-Cd Dual Battery Array Solid-State Non-Volatile Memory
Chassis Execution 3U Rack-Mountable Shell 4U Heavy-Duty Chassis 6U Structural Frame

Technical Specifications

  • Power Input Requirements: 100-240V AC, 50/60 Hz Adaptive Core Input

  • Contact Output Capacity: Relays rated up to 30V DC, 2A for direct external equipment triggering

  • Memory Retention: Hardware-isolated Ni-Cd backup battery system (recommended 4-year cycle replacement)

  • Switching Infrastructure: Space-division electronic crosspoint matrix architecture

  • Enclosure Finish: Surface-treated industrial steel casing, anti-static matte black finish

Deployment and Installation

System positioning, structure assembly, and infrastructural line deployment are strictly performed by authorized engineering personnel from SKYRS within Pakistan.

Physical Mounting Protocol

The EXES-1000 Master units are standard 19-inch rack-mountable devices. Ensure a minimum of 1U thermal ventilation spacing above and below the main chassis inside the server enclosure.

Battery Activation Sequence

Before structural deployment, the mini-jumper for battery backup on the CCU-11B processor board must be moved from the shipping OFF position to the active ON position to engage continuous memory registration.

System Configuration

System configuration workflows must be completed through localized engineering to validate active product warranties.

Step 1: Core Processor Setup

Power off the primary alternating current line before executing modifications. Insert the main CCU-11B module into the designated core exchange slot. Moving or inserting cards while lines are active can cause physical damage to sensitive relay traces.

Step 2: Function Selection Configuration

Manually define system behavior using the internal dual inline package switches (SW-A and SW-B) situated on the primary control card. Set priority overrides, paging durations (short 0.7-second vs. long 1.3-second options), continuous call tones, and push-to-talk settings according to facility guidelines.

Step 3: Station Registration Mapping

Initiate system programming directly via Station Number 11 (the hardcoded programming terminal). Define master-to-sub cross-connections, group paging zones, and continuous call distribution patterns through the master alphanumeric dialing sequence.

Service and Configuration Availability

The provision of all system variants, on-site infrastructure deployment, physical structural installation, and advanced internal circuit configuration for the EXES-1000 Master series are available exclusively through SKYRS in Pakistan. Modifications, programming adjustments, or line service performed by unauthorized technicians will nullify the standard product warranty. To coordinate structural surveys or schedule commissioning engineers, connect with the SKYRS Pakistan system integration office.

Description